The objective of the Study was the final design for the configuration and improvement of the road section linking the settlement of Myrkino with the new bridge of River Aggitis. The last has already been drawn and approved (improvement of geometric characteristics and accessibility of the village road network) and at that time it was under construction. The new bridge connects Myrkino, Draviskos and Paleokomi with the new bridge of Strymonas river and hence the area of Mavrothalassa.
Info
-
Client : Region of Central Macedonia
-
Area of Study : Serres, Greece
-
Timeframe : 30/12/1999 - 30/12/2000
-
Budget : 174.092, 54 euro