The objective of this project was to draft hydrologic and water studies in order to delineate the streams located in the areas to be urbanized.
Info
-
Client : Municipality of Thermaikos
-
Area of Study : Thermaikos, Greece
-
Timeframe : 23/01/2008 - 27/06/2011
-
Budget : 108.000 euro